NWOhioChevyGuy
Well-known member
Exciting day here on The Hill
Got my Building Permit for my attached garage build.
Garage will be self built, with concrete work sub’d out as soon as the MI frost laws are lifted this spring.
Before that time todo list:
1) finish cleaning up trees that needed removed &/or trimmed up
2) demo concrete from carriage house / shed I moved a few years ago (yes there was a thread on that). https://www.garagejournal.com/forum/showthread.php?t=296545
3) dig out two tree stumps that were cut down years ago that will be in new driveway area
4) excavate for footers and foundation walls - poured walls, and crawl for front 12’ mud room / 3/4 bath area
Build will be 40’x28’ w/ attic trusses
Done in stages;
Current Permit is for Garage structure & electrical only
bath /“house” addition area at front will be done at a later time, attic truss room will be finished off at a later time.
Look forward to keeping you all up to date on my project.
Got my Building Permit for my attached garage build.
Garage will be self built, with concrete work sub’d out as soon as the MI frost laws are lifted this spring.
Before that time todo list:
1) finish cleaning up trees that needed removed &/or trimmed up
2) demo concrete from carriage house / shed I moved a few years ago (yes there was a thread on that). https://www.garagejournal.com/forum/showthread.php?t=296545
3) dig out two tree stumps that were cut down years ago that will be in new driveway area
4) excavate for footers and foundation walls - poured walls, and crawl for front 12’ mud room / 3/4 bath area
Build will be 40’x28’ w/ attic trusses
Done in stages;
Current Permit is for Garage structure & electrical only
bath /“house” addition area at front will be done at a later time, attic truss room will be finished off at a later time.
Look forward to keeping you all up to date on my project.