Have plans to start a 1600 sq ft house with 2 car garage and 1200 sq ft detached garage (shop) build. Corner city lot in old part of town that allows that big of detached garage (most don't). Struggling with the fact that we are over building in that part of town and trying to keep the cost down - we can afford it and don't plan to move but health and other things may change where we need to. About 6 years from retirement.
Elevations are critical - house is a walkout and slope of lot is just enough to do that. Its a corner lot with the drive for the shop off the other street where its fairly flat.
We were our own GC for our current house and hired out most of the work although I did all the electrical and hydronic floor heat and lots of other work on various things to keep things moving.
Current plan is to have an engineering company help with getting the foundation in since elevations are critical.
We are thinking we may put off the shop for now and try to find someone in the next few years to do it. But it seems like getting the foundation in at the same time as the house might save a significant cost and only tear up the yard once.
Wondering if I should get the shop up at the same time. Final plan is for insulation, HVAC and a half bath. Considering if I should just do the shell with floor, rough in the bath and bring utilities to the building but skip the insulation, sheetrock, HVAC, etc. We could then have some time to find deals on those things and do some ourselves.
One of the concerns is that the building code here isn't on the latest revision and if we wait they are likely to move to the newer one and that will raise the cost.
Thoughts?
Elevations are critical - house is a walkout and slope of lot is just enough to do that. Its a corner lot with the drive for the shop off the other street where its fairly flat.
We were our own GC for our current house and hired out most of the work although I did all the electrical and hydronic floor heat and lots of other work on various things to keep things moving.
Current plan is to have an engineering company help with getting the foundation in since elevations are critical.
We are thinking we may put off the shop for now and try to find someone in the next few years to do it. But it seems like getting the foundation in at the same time as the house might save a significant cost and only tear up the yard once.
Wondering if I should get the shop up at the same time. Final plan is for insulation, HVAC and a half bath. Considering if I should just do the shell with floor, rough in the bath and bring utilities to the building but skip the insulation, sheetrock, HVAC, etc. We could then have some time to find deals on those things and do some ourselves.
One of the concerns is that the building code here isn't on the latest revision and if we wait they are likely to move to the newer one and that will raise the cost.
Thoughts?