I can't do the shop first. I could get a permit for both at the same time. I considered putting in the foundations and then the shell of the shop first for storage but that would mean framing inspection of the shop before the house and I don't think that will fly. It's house first or both together. I am leaning toward both together.
Well, since you have the choice of both or house first, I would do both.
Last edited:
