Hi, I’m going to be adding a second story in my pole barn. I’m wondering if it would be best to do before or after I pour a concrete floor. I live in Minnesota. If I do it before I could set posts in ground and pour footings, then pour the floor later around these posts. If I install after the floor, the new posts would rest on top of the floor, being secured by anchors and brackets. Do you think one option is better than the other?
