Hi, I’m going to be adding a second story in my pole barn. I’m wondering if it would be best to do before or after I pour a concrete floor. I live in Minnesota. If I do it before I could set posts in ground and pour footings, then pour the floor later around these posts. If I install after the floor, the new posts would rest on top of the floor, being secured by anchors and brackets. Do you think one option is better than the other?
 
To avoid these ads, REGISTER NOW!

matt_i

Well-known member
Joined
Mar 14, 2008
Messages
10,724
Location
SE Michigan
I think that preparing for this before you pour the concrete floor is best.

I can think of a thick concrete footing so you transfer loads to the ground easily, just like the external posts of the building.

Plus the post buried in the underlying soil makes it moment-resisting (won't fall over easily by side loading up high). It would take quite the steel bracket at the base to keep a lever of the length I'm picturing upright under a mild side load....
 
To avoid these ads, REGISTER NOW!

bridferr

Member
Joined
Aug 17, 2018
Messages
10
Location
florida
Your first option sounds better. Good luck to your plan, show us the result or the progress also.
 

larry_g

Well-known member
Joined
Apr 28, 2007
Messages
16,872
Location
oregon
I had a second floor planned into my building and added extra posts to facilitate the job. You can see them in my build below.

lg