Well I've been doing a bit more work on the place, but the electrical is still holding me up. We got the new panel all installed and all the wires run where they need to go, but SDG&E is being a real pain in the ***. Basically they wont allow my electrician to do the final hookup. Instead they want to come out themselves in the morning, disconnect, have me do all the work, get it inspected, and then come back to reconnect later the same day. Seems reasonable until you think about how much work it takes to get a new panel of this size installed and hooked up. It took us 3 days of work to get where we are now. Thankfully i was able to put the new panel in a different spot than the old one, and will be gutting the old one and using it as a junction box. If I had to put the new where the old was I would have been without power for a minimum of 5 days thanks to SDG&E's retarded policy.
ANYWAYS.....the new panel is up, and I have the service guys scheduled to come out, but unfortunately they cant come out til next tuesday, which means another 2 weeks without real power in my shop

At least I have this pretty new panel to look at though. As you can see, it's pretty massive. In the first shot you can see my current weatherhead and hookup behind the new one. Can you say BEEF!
Right now I'm essentially working off of extension cords and one 30A overhead feed that turns on the lights. Did I mention they are bright? These pics were taken just a few minutes ago (around 10pm) with no flash.
Thankfully I was also able to run a 220V cord to the old panel to run my welder, so I've been working on getting my mezzanine built. The orange pallet rack beams have a notch in them so that you can just lay 2x6's down flat to make shelves. I'm gonna copy this design on the beams I added using some 2" square tube so that the entire floor will be 2x6's with sheets of plywood across the top. Should make for a nice sturdy storage floor. I'm hoping that I can get at least the mezzanine floor all finished up this week, and start getting all my cabinets and stuff put away upstairs so that when I finally get power I'm ready to work.