Hello. I am in the planning stages of building a garage on the property behind my house. The area has a slope to it. I’m not sure the degree. What I am needing to build is a two bay shop with enough height for a lift. A “barn type” look I guess is what I’m wanting. On a concrete slab. What are the different techniques for building on a slope? What are the advantages and disadvantages to each? From what research I’ve done, it seems like the options are to “fill in (build up)” to make a level surface. Or do the opposite and “cut in” to the hill. I’ve never done anything like this but I have pictured in my mind, poured walls on the sides and then on the downhill end and then you would fill in with dirt to make that level. And then the “cut in” method would be the opposite of that and your building would be partially underground. Is that correct? Any help appreciated.

