Hi Wiliam,
Let me preface this with the fact that I know little to nothing about electricity...
That said, I will try to respond to your post. IIRC, we have a 12kv line coming into a 3 phase transformer. As I understand it we will be able to run both single and three phase out of this. There is also something about the new transformers now going to 208v rather than 240v - not sure I understand all that.
What is a CT?
Yes on th panel in the shop.
Michael
Let me preface this with the fact that I know little to nothing about electricity...
That said, I will try to respond to your post. IIRC, we have a 12kv line coming into a 3 phase transformer. As I understand it we will be able to run both single and three phase out of this. There is also something about the new transformers now going to 208v rather than 240v - not sure I understand all that.
What is a CT?
Yes on th panel in the shop.
Michael
W-Cummins said:Looks like your moving ahead!
As for the metering I assume that your running @ 240V and your all reddy CT metered on the 1st base you have installed. If so just add another meter section to the panel to hold the meter head and another set of CT's and pass all the ag stuff through them. I guess that you could also run all the non ag stuff through the CT's if your running a lot of ag circuits ( I also assume that your going to have a sub panel in the shop)??
William.....