Sokoloff
Well-known member
I know that an outbuilding can only have one AC power feed from the main supply. That will be a 100A, 4 wire feeder to a subpanel.
Q1. If I also want the outbuilding to have outdoor spotlights, controlled by switches in the main house such that the outdoor lights on both buildings come on together, can I address this legally by having switched 120VAC lines coming from the house to the outbuilding? (Think "in the era before smart switches, how'd we do this?") If so, what are the restrictions? Can they be in the same conduit as the feeder (assuming fill requirements are observed)? Can they be in the same conduit inside the outbuilding as sub-panel fed circuits?
Q2. Suppose in addition to Q1 situation, I want to have a local override for the outbuilding lights. Do these situations change anything or cause addition commentary/warnings?
Q2a. A three-way switch controlling the outbuilding lights either with or opposite the main house spotlights, (with the power always coming from house).
Q2b. A cut-off switch, meaning a single-throw switch that allows the lights to follow the main house spotlights or be always off.
Q2c. An over-ride switch, meaning a double-throw switch that allows the lights to follow the main house spotlights or be always on.
Thanks!
Q1. If I also want the outbuilding to have outdoor spotlights, controlled by switches in the main house such that the outdoor lights on both buildings come on together, can I address this legally by having switched 120VAC lines coming from the house to the outbuilding? (Think "in the era before smart switches, how'd we do this?") If so, what are the restrictions? Can they be in the same conduit as the feeder (assuming fill requirements are observed)? Can they be in the same conduit inside the outbuilding as sub-panel fed circuits?
Q2. Suppose in addition to Q1 situation, I want to have a local override for the outbuilding lights. Do these situations change anything or cause addition commentary/warnings?
Q2a. A three-way switch controlling the outbuilding lights either with or opposite the main house spotlights, (with the power always coming from house).
Q2b. A cut-off switch, meaning a single-throw switch that allows the lights to follow the main house spotlights or be always off.
Q2c. An over-ride switch, meaning a double-throw switch that allows the lights to follow the main house spotlights or be always on.
Thanks!