Have a 30x34 put up last week and had to get gravel to help level out before concrete is poured. My outside metal is ran all the way down on the outside of skirt board. Having 8x34 slab poured for a porch in front of the building. Since I'm getting 4inch concrete inside and metal is all the way down on the skirt outside I will have a four inch drop in concrete from inside to outside unless I want concrete to cover up my metal on the outside for the porch. My plan was to dig below skirt board 1.5 inches so concrete will out be up 2.5 on skirt board on inside. Have a transition drop at garage doors of a 1 inch and slope of 1.5 to meet concrete for porch. This way concrete won't be poured and touch metal siding. Does this sound right thing to do? Guess it would of been easier if my builder just but the metal siding higher on the skirt board. Any input would help and I will try to post some pics