Hi Guys,
I have a concrete project with a 5,304 square foot (65.48 sq yards of concrete) main slab that will be poured across 2 days with half being poured the first day and the remainder the second day.
Then there is a patio which is 26.75 square yards that would be poured later after the main slab cures some and after the forms are removed.
The street price for concrete here is $146 per square yard. We will need 65.48 square yards for the main slab. That is $9,560.00 for the concrete. Since it will be colored, that adds another $3,797.00 to the cost or $13,357 in material cost for the main slab. The patio at 26.75 square yards is $3,905 in materials.
So total materials is about $17,263.00 Keep in mind he doesn't pay that as he get's the contractor price on materials.
The bid for labor and materials came in at $31,460.00. That means he has about $14,197.00 in labor built into the bid. There is also the cost of (I presume, wire mesh) and poly that I have't factored in so materials would be slightly higher than my calculation.
I suspect his cost on the concrete is about $1,000 less than street price so really he has labor at about $15,200.00. That seems high. What do you guys think?
I have a concrete project with a 5,304 square foot (65.48 sq yards of concrete) main slab that will be poured across 2 days with half being poured the first day and the remainder the second day.
Then there is a patio which is 26.75 square yards that would be poured later after the main slab cures some and after the forms are removed.
The street price for concrete here is $146 per square yard. We will need 65.48 square yards for the main slab. That is $9,560.00 for the concrete. Since it will be colored, that adds another $3,797.00 to the cost or $13,357 in material cost for the main slab. The patio at 26.75 square yards is $3,905 in materials.
So total materials is about $17,263.00 Keep in mind he doesn't pay that as he get's the contractor price on materials.
The bid for labor and materials came in at $31,460.00. That means he has about $14,197.00 in labor built into the bid. There is also the cost of (I presume, wire mesh) and poly that I have't factored in so materials would be slightly higher than my calculation.
I suspect his cost on the concrete is about $1,000 less than street price so really he has labor at about $15,200.00. That seems high. What do you guys think?