I had a drive poured last Wednesday, six days ago. It is 3000# mix with a 2% accelerator, supposedly at least four inches thick. The guy who poured/finished it said wait 2 days to drive on it. Reading around I found the least amount of time suggested was 3 days. Most said a week so I wanted to wait a week. There is stormy weather predicted for tonight and I'd like to get my car and pickup under roof.
The surface has turned from mostly gray to mostly white with a few small spots of gray left. Does the surface color indicate anything about the degree of cure?
Any opinion about parking a 4200# pickup on it after 6 days?
Thanks for opinions from those with concrete experience.