Okay bear with me I am not a concrete person. I am building a garage and I don't know squat lol.
So I have the footers figured out I am lost on the slab.
So my plan was footer then 2 courses of 8x16 block then a course of 8in L block so I could have the L turned inside pour the floor and bring the concrete to the top of the block to screed. up to that point in my head it works.but I want another layer of block high to build the wall off the floor.
I hope this makes sense.
When it all boils down to it I want a level floor not sloped and I want 1 block higher than the floor to start the walls and I really don't know how to do it and screed the concrete.
So I have the footers figured out I am lost on the slab.
So my plan was footer then 2 courses of 8x16 block then a course of 8in L block so I could have the L turned inside pour the floor and bring the concrete to the top of the block to screed. up to that point in my head it works.but I want another layer of block high to build the wall off the floor.
I hope this makes sense.
When it all boils down to it I want a level floor not sloped and I want 1 block higher than the floor to start the walls and I really don't know how to do it and screed the concrete.