Well-known member
OK well this weekend I spent all day Saturday running a concrete saw to gain access to replumb my pool. I have some demo still to do as some concrete was thicker than the saw would cut, so next weekend I get to rent a jack hammer to finish the demo.
My question with these cuts, that are 7" wide in a fully cured pad, do I need to add anything to the mix when I pour the new concrete?
I have not figured out the amount of concrete required but I'm sure its too small for redi-Mix so I will be using sacrete and mixing it myself.
Original pad is on a base of sand, (we live on a sand hill) and no cracks over the 30-40 years of being in place. Only had wire mesh and it was on the bottom of concrete, as they didn't pull it up when it was poured.
Thanks in advance.
My question with these cuts, that are 7" wide in a fully cured pad, do I need to add anything to the mix when I pour the new concrete?
I have not figured out the amount of concrete required but I'm sure its too small for redi-Mix so I will be using sacrete and mixing it myself.
Original pad is on a base of sand, (we live on a sand hill) and no cracks over the 30-40 years of being in place. Only had wire mesh and it was on the bottom of concrete, as they didn't pull it up when it was poured.
Thanks in advance.