Hey guys I've got a 30 x 60 pole barn going up right now. All that is left is the concrete pour and installing the roll up door. I'm not the most educated person when it comes to erecting a building or pouring concrete so I was looking for advice.
They are planning on coming out tomorrow pending my sand arrival. The company asked for 2 14yd loads of fill sand to be supplied so they can grade out the pre existing dirt pad (this is standard on their builds). I guess they will come out the next day or two afterwards to pour the concrete.
Is there anything to pay attention to when they pour the concrete? I most likely will not be available to supervise the pour, but I'm planning on making it out there around the time they are finishing up. I know I'm supposed to specify the finish I'd like (smooth as possible) but besides that I don't even know what to look for to make sure things are done correctly. They are pouring a 4inch slab.
If you guys could shine some light it would be greatly appreciated. I'm looking forward to starting a build thread once I get this thing going.
They are planning on coming out tomorrow pending my sand arrival. The company asked for 2 14yd loads of fill sand to be supplied so they can grade out the pre existing dirt pad (this is standard on their builds). I guess they will come out the next day or two afterwards to pour the concrete.
Is there anything to pay attention to when they pour the concrete? I most likely will not be available to supervise the pour, but I'm planning on making it out there around the time they are finishing up. I know I'm supposed to specify the finish I'd like (smooth as possible) but besides that I don't even know what to look for to make sure things are done correctly. They are pouring a 4inch slab.
If you guys could shine some light it would be greatly appreciated. I'm looking forward to starting a build thread once I get this thing going.