I'm going to be prepping for a concrete slab in my driveway. I have finally gotten tired of having to crawl in the gravel and am going to pay for one to be poured.
I'm going to go with a slab that is 22'x25'x6" deep. I want to be able to roll my projects out into the driveway without having to worry about the gravel making them tip over or difficult to roll. I am also planning on doing some of the prep-work myself to save money. A buddy will be helping me with the concrete laying and finishing, and probably the frames if I can get him to offer his advice.
The plan is to reinforce it with rebar so it is tough and strong. I was wondering if there were any "additions" to the concrete slab anyone would make. Some people put a pit for their garage or a lift is built in. Are there "additions" to the slab anyone would recommend?
Any comments or advice for laying this project down? I am going to hire a guy with an excavator to come and do the digging portion.
I am planning on him digging approximately 8" deep so I can compact gravel underneath to the depth of 6" for the concrete. He said he'd be able to knock out that amount of space in about three hours or so at the cost of $300.
I'm paying my buddy about $250 for his help finishing and pouring.
Any framing advice?
Thanks!


I'm going to go with a slab that is 22'x25'x6" deep. I want to be able to roll my projects out into the driveway without having to worry about the gravel making them tip over or difficult to roll. I am also planning on doing some of the prep-work myself to save money. A buddy will be helping me with the concrete laying and finishing, and probably the frames if I can get him to offer his advice.
The plan is to reinforce it with rebar so it is tough and strong. I was wondering if there were any "additions" to the concrete slab anyone would make. Some people put a pit for their garage or a lift is built in. Are there "additions" to the slab anyone would recommend?
Any comments or advice for laying this project down? I am going to hire a guy with an excavator to come and do the digging portion.
I am planning on him digging approximately 8" deep so I can compact gravel underneath to the depth of 6" for the concrete. He said he'd be able to knock out that amount of space in about three hours or so at the cost of $300.
I'm paying my buddy about $250 for his help finishing and pouring.
Any framing advice?
Thanks!