local code and electric company may dictate diameter....
here in TN,per the local utility (sub TVA) an underground feeder has to be Schedule 80, buried 2.5 ft or deeper, or incased in concrete with 3' sweeps and 2.5" minimum diameter for 200 amp service. 400 amp has larger diameter, deeper burial and wider sweeps
YMMV