I am installing a long (close to 300') run of 4/0 MHF to my detached shop and am using 2.5" conduit at both ends where I come up out of the ground. I have some schedule 80 to go from the LB entering the house/\shop down into the ground, but I am unable to source a schedule 80 sweep anywhere around here.
Is a sweep required in this instance? If so I am probably just going to dig super deep by the house/shop and use a sch 40 sweep. If not can I just run out the bottom of the 'raw' PVC? Or do I need a bell end or some type of transition?
I'm not concerned about damage due to where the cable runs, (near an 'inside' corner on the outside of the house) but want to make sure I meet code and pass inspection with no issues.
HK
Is a sweep required in this instance? If so I am probably just going to dig super deep by the house/shop and use a sch 40 sweep. If not can I just run out the bottom of the 'raw' PVC? Or do I need a bell end or some type of transition?
I'm not concerned about damage due to where the cable runs, (near an 'inside' corner on the outside of the house) but want to make sure I meet code and pass inspection with no issues.
HK