Are there guidelines on a wire (or wires) size to interconnect two ground bars in a subpanel?
I saw another older post and there were opinions both ways on whether or not it was required, but if it were done, any thoughts on wire size requirements?
I saw another older post and there were opinions both ways on whether or not it was required, but if it were done, any thoughts on wire size requirements?