So I contract with a guy to build a garage this past January. I give him a deposit and then spend the next three months chasing him down as to when he will start. That said, the weather here in KY has been challenging, but not so bad that several streets over they have put three new houses under roof.
So the concrete guy shows up today and shoots the grade and has a big to do that there is a 6' drop from front right to back left. Says they assumed it was around 3'. Both him and the garage builder that I have the contract with came to the site before it was bid. Builder is now telling me that this new news will cost about $3000 more in extra split face block and rock to fill in the floor. Lastly, I am now told that I will have to have a floating floor vs a floor that is tied into the block/footer.

...
The builder tells me on the phone that he cannot eat the cost... The concrete guy says to offer to split it with him. I feeling telling them both to take their rock and block and stuff it were the sun doesn't shine. At this point if it cost me another 1500 to get the damn thing done it will piss me off, but I just want the damn thing done...
Here is the specs: 24x37, brick on front, dimensional shingles to match the house, vinyl on three sides, 18'x8' insulated door, man door, two windows, 100 amp electric w/ about a 300' run from source, two rows of split face block, 9' framed walls (block and frame will give me 10.5' ceiling), 5/12 pitch., vapor barrier under slab..... and 700 sq' concrete for driveway... $22,800...
So the concrete guy shows up today and shoots the grade and has a big to do that there is a 6' drop from front right to back left. Says they assumed it was around 3'. Both him and the garage builder that I have the contract with came to the site before it was bid. Builder is now telling me that this new news will cost about $3000 more in extra split face block and rock to fill in the floor. Lastly, I am now told that I will have to have a floating floor vs a floor that is tied into the block/footer.
The builder tells me on the phone that he cannot eat the cost... The concrete guy says to offer to split it with him. I feeling telling them both to take their rock and block and stuff it were the sun doesn't shine. At this point if it cost me another 1500 to get the damn thing done it will piss me off, but I just want the damn thing done...
Here is the specs: 24x37, brick on front, dimensional shingles to match the house, vinyl on three sides, 18'x8' insulated door, man door, two windows, 100 amp electric w/ about a 300' run from source, two rows of split face block, 9' framed walls (block and frame will give me 10.5' ceiling), 5/12 pitch., vapor barrier under slab..... and 700 sq' concrete for driveway... $22,800...