How has your contractor's quality of work been. I have had two different contractors for my current build. Both are known for doing good work.
The dirt contractor took three tries to get the building site level. Messed up digging the 42" deep frost footings. All of this took over 25 days to complete.
Because of the dirt contractor mess up I had to switch to pan forms for the concrete walls 4' high. When the contractor pulled the pans off, you can see where he started the next load of concrete. I have three areas in the wall that did not have any concrete around some pipes for the pex tubing. These are on the side that faces my house. He patched two additional holes with some cheap vinyl concrete patch and did not even bother to match it with a striker to make it even look somewhat like the pan formed walls. Tons of large pock marks on all down the entire wall facing the house.
On that note any ideas on how to patch the concrete to make it look good so I can stand to look at it without becoming pissed?
The dirt contractor took three tries to get the building site level. Messed up digging the 42" deep frost footings. All of this took over 25 days to complete.
Because of the dirt contractor mess up I had to switch to pan forms for the concrete walls 4' high. When the contractor pulled the pans off, you can see where he started the next load of concrete. I have three areas in the wall that did not have any concrete around some pipes for the pex tubing. These are on the side that faces my house. He patched two additional holes with some cheap vinyl concrete patch and did not even bother to match it with a striker to make it even look somewhat like the pan formed walls. Tons of large pock marks on all down the entire wall facing the house.
On that note any ideas on how to patch the concrete to make it look good so I can stand to look at it without becoming pissed?