hoffman912
Well-known member
so i had a new pad poured this fall, and i am starting to do research on what to do in spring when i paint it in rust bullet.
My pad did not have saw cut joints but the kind where they make a V shape trowl edge across the floor, dividing it in 4ths. I am assuming that is a control joint (correct me if there is another term for it). pad is 17x25.
OK, enough rambling and on to the question: Should i fill those in, or is it bad to fill it in? I like the idea of a floor i can roll across with out falling in a joint, but i dont want to hurt the pad if that needs to remain for expansion/contraction.
If it is OK to fill in, what should i use?
My pad did not have saw cut joints but the kind where they make a V shape trowl edge across the floor, dividing it in 4ths. I am assuming that is a control joint (correct me if there is another term for it). pad is 17x25.
OK, enough rambling and on to the question: Should i fill those in, or is it bad to fill it in? I like the idea of a floor i can roll across with out falling in a joint, but i dont want to hurt the pad if that needs to remain for expansion/contraction.
If it is OK to fill in, what should i use?
