Nigeltufnel
Member
- Joined
- May 4, 2010
- Messages
- 21
I’m looking to remove and replace a portion of my concrete floor in preparation for a 2-post lift (BendPak XPR-10). I just had an estimate for cutting out a 15x13.5 foot portion of the floor and replacing it with 6” thick 3000PSI concrete (the size was chosen to correspond to existing control joints).
The estimate came in at $2500 (NE Ohio). Does this sound reasonable? I have no idea what something like this should cost.
The estimate came in at $2500 (NE Ohio). Does this sound reasonable? I have no idea what something like this should cost.
