BillGalbraith
Well-known member
- Joined
- Dec 19, 2009
- Messages
- 270
Just had a new floor poured 3 weeks ago. Spent the extra money to get 3500 psi concrete and fiber mesh. I still got a crack, about an inch from the stress relief cut. You know that damn thing is going to run many feet before migrating over to the cut.
