I've got a good 1/2" crack across my floor that really never changes but bothers my wife so I'm tasked with filling it. What should I use for such a large crack that will expand and contract seasonally? Fill it with foam backer first? If so, how deep should I put the foam so I get a good seal with the sealant?
 
To avoid these ads, REGISTER NOW!

Chris705

Well-known member
Joined
Nov 1, 2012
Messages
834
Location
The Finger Lakes of NY
Your backer rod wants to be the width of the crack (maybe think about running a grinding wheel along the crack to make a consistent width)...set the rod about 1/4" or so below top slab level. The sealant as zeke describes above is available at HD. using a caulk gun apply the sealant on top of the rod and let it self level. Fill to top of slab (or slightly above) with repeated applications within minutes of each other. Let cure overnight and the next day or so you can cut flush to top of slab with a razor scraper.
 

Zippercat

Well-known member
Joined
Jul 13, 2013
Messages
828
Location
TN
If the crack is really deep or has lot of variation in width, I suggest filling the crack with sand to within about 3/4 to 1/2 inch of surface instead of using backer rod. Then use the Sikaflex self leveling as recommended above.

Sikaflex is pretty runny and will drain around the smallest of gaps by the backer rod. Also, if the temperature is under 50 F expect thicker areas of Sikaflex to take a day or more to cure.
 

lakeroadster

Well-known member
Joined
Jan 19, 2015
Messages
5,166
Location
Central Colorado
Last edited:

roc_on_the_rocks

Well-known member
Joined
Mar 14, 2010
Messages
1,520
Location
South central Indiana
I had a similar need recently, where the varying width of the crack wasn't suitable for backing rod. Searched a bit on GJ and saw some people using Great Stuff insulating foam sealant. It worked like a charm. Just apply very little rate, you don't want the foam to overgrow too much (although it can be trimmed later). And as Zippercat just said, Silkaflex is vey runny, so if the bottom of the crack isn't sealed well, it'll keep draining expensive caulking.
 
To avoid these ads, REGISTER NOW!

rburke65

Well-known member
Joined
Nov 10, 2007
Messages
12,349
Location
Canfield, Ohio
I just have the width of the saw blade from when they cut my floor after the pour. Rather than stuffing backer rod in the saw kerf, can I not sweep sand into the cut and then use the Sika flex to fill the cut? Seems to me to be faster than stuffing backer rod into the kerf. Did not mean to hijack thread. Thanks.
 

lakeroadster

Well-known member
Joined
Jan 19, 2015
Messages
5,166
Location
Central Colorado
I just have the width of the saw blade from when they cut my floor after the pour. Rather than stuffing backer rod in the saw kerf, can I not sweep sand into the cut and then use the Sika flex to fill the cut? Seems to me to be faster than stuffing backer rod into the kerf. Did not mean to hijack thread. Thanks.

Yes.

Otherwise you'll use copious amounts of sealer.... ask me how I know :lol:

Getting tired of shop vacuuming the control joints after every woodworking project so I bought 3 tubes of Sika Flex Self Leveling Sealant at Lowes.

It'll take another 4 tubes to finish the maintenance bay.



 
Last edited:

Shea

Well-known member
Joined
Sep 19, 2012
Messages
2,863
Location
California
SikaFlex is non paintable and very flexible. Coatings will not adhere well and can crack or fracture under pressure over the joint since the sealant will allow too much flex.
 

Ch3No2

Well-known member
Joined
Nov 27, 2009
Messages
356
Ardex Feather Finish if you are going to coat it...excellent results.
 