I have a lot of no. 2 clear left over. Just dig a swale around end of pipes, maybe line with a scrap piece of geotextile, and dump the no. 2 so maybe pipes are 6" into it and another 6 to 12 past pipe ends? I like not having to buy anything. Just dont want plant growth clogging it and requiring annual redos. Sounds good.