
My son was the first to move his truck in the new shop.

I have to finish wrapping the other 6x6 to match the left side of the loft

I like the way the man door turned out. I do feel that is needs a better calling job.
As far as the next steps.
I am waiting to do to much till after the overhead door gets installed. In the meantime i will be grinding down any hi spots in the slab, and working on getting the electrical service reconnected.