I am in the process of building my shop
40x40 pole building.
I had help setting the main poles, trusses and putting the roof metal on. I have 3 sides ready to go that I did by myself.
The lot behind my house that I bought to build on is sloped. 13" across the 40'. Sloped towards the back of my house.
I chose to dig down on the high side instead of building up. If the slope would have been away from the house I would have just built up.
The left side of the building top of concrete is now 9" or so higher than grade. Front will be 5" or so depending on final grade.
On the left side since it was a hill that I was cutting down I decided to level out another 15' and build a lean to at a later time to assist in keeping water away from the building.
Left/Rear of building
Left of building showing where lean to will be built at a later time as well as front towards the driveway
I have the lean to area graded so that water flows away from the building towards the left also towards the back of the building however it does not drain quick enough from this area. I can not go higher on the front left corner and cant go lower on the left rear corner. Once this lean to is built and gutters are up I dont see it as being quite the problem it is now.
In this area I am thinking about grading the area towards the center and installing a drain and 4" pipe flowing towards the front of the building and emptying in a ditch. I will eventually concrete this area as well as the driveway but for now it will be stone.
thoughts on this??
Now onto the driveway. The area in front will be graded down about 4" from the middle of the front towards the left. Plenty of slope and no drainage issues in the front, right and rear of building. Then it will taper down into the lean to area.
I have clay soil.
What should I do before putting stone in this area? I also have to place a culvert in front of the gates in the one picture. Thoughts on how to go about doing this??
I do have a guy that will be coming to do final grade for me but I would also like to have some sort of idea before he comes. He has stopped by to look and said there would be no problems with drainage already but did not go into details at the time.
The front and right of building. Plenty of room to do final in this area.
Sorry for the long post but I am trying to do as much of this myself as possible
40x40 pole building.
I had help setting the main poles, trusses and putting the roof metal on. I have 3 sides ready to go that I did by myself.
The lot behind my house that I bought to build on is sloped. 13" across the 40'. Sloped towards the back of my house.
I chose to dig down on the high side instead of building up. If the slope would have been away from the house I would have just built up.
The left side of the building top of concrete is now 9" or so higher than grade. Front will be 5" or so depending on final grade.
On the left side since it was a hill that I was cutting down I decided to level out another 15' and build a lean to at a later time to assist in keeping water away from the building.
Left/Rear of building
Left of building showing where lean to will be built at a later time as well as front towards the driveway
I have the lean to area graded so that water flows away from the building towards the left also towards the back of the building however it does not drain quick enough from this area. I can not go higher on the front left corner and cant go lower on the left rear corner. Once this lean to is built and gutters are up I dont see it as being quite the problem it is now.
In this area I am thinking about grading the area towards the center and installing a drain and 4" pipe flowing towards the front of the building and emptying in a ditch. I will eventually concrete this area as well as the driveway but for now it will be stone.
thoughts on this??
Now onto the driveway. The area in front will be graded down about 4" from the middle of the front towards the left. Plenty of slope and no drainage issues in the front, right and rear of building. Then it will taper down into the lean to area.
I have clay soil.
What should I do before putting stone in this area? I also have to place a culvert in front of the gates in the one picture. Thoughts on how to go about doing this??
I do have a guy that will be coming to do final grade for me but I would also like to have some sort of idea before he comes. He has stopped by to look and said there would be no problems with drainage already but did not go into details at the time.
The front and right of building. Plenty of room to do final in this area.
Sorry for the long post but I am trying to do as much of this myself as possible