Rainy day here so I'm stuck inside getting leaked on trying to be busy. Looking at finishing up all the blocking. Adding blocks for my proposed outlet locations and switches.
Plan to run surface mounted EMT around the circumference on the upper walls and do drops down to each outlet.
How high should I run that top course? I have the blocking 1.5ft down from the top plate. Wondering if I should run it higher, or install another 2x6 block above it for future runs?
What else should I look into adding blocking for while Im here?
Ill likely use sections of unistrut between studs later for mounting shelves, etc. And plan to add tons of blocking in the ceiling for outlets, extension cord/hose reels, etc.
Plan to run surface mounted EMT around the circumference on the upper walls and do drops down to each outlet.
How high should I run that top course? I have the blocking 1.5ft down from the top plate. Wondering if I should run it higher, or install another 2x6 block above it for future runs?
What else should I look into adding blocking for while Im here?
Ill likely use sections of unistrut between studs later for mounting shelves, etc. And plan to add tons of blocking in the ceiling for outlets, extension cord/hose reels, etc.