thegarageguy
Well-known member
This was a 4000 Sqft project where we had to remove VCT, grind off the mastic, crack fill, patch, create an integral 4 inch coving and a poured epoxy chip floor with a chipped stripe through out. It took us 6 days with 5 guys, 2 - 20 inch 5 hp grinders, 1 - 30 inch 5 hp grinder and 2 hand grinders for edging. Any questions on the process, ask away. 
More pics on this link: http://s257.photobucket.com/albums/hh209/garageandbeyond/Mobile Uploads/edhard/
More pics on this link: http://s257.photobucket.com/albums/hh209/garageandbeyond/Mobile Uploads/edhard/

Floor looks great!