Hi guys,
I bought epoxy-coat full kit to do my 2 car garage floor. I heard the drying time is like 15 mins. So I am going to mix Part A and B in batches of 2 . Does this sound correct? Now my question is, when you finish the first batch and start mixing 2nd batch , I'm not sure how long it takes to mix the batch as typically you have to stir for some minimum time etc.
In other words, if you have to put down epoxy on 2 car garage floor area how would you do it so you can not see the lines and it all looks uniform. Also for some reason if you are not able to finish the whole floor and fall little bit short, can you epoxy the remainder of the floor some other time without much issues?
I bought epoxy-coat full kit to do my 2 car garage floor. I heard the drying time is like 15 mins. So I am going to mix Part A and B in batches of 2 . Does this sound correct? Now my question is, when you finish the first batch and start mixing 2nd batch , I'm not sure how long it takes to mix the batch as typically you have to stir for some minimum time etc.
In other words, if you have to put down epoxy on 2 car garage floor area how would you do it so you can not see the lines and it all looks uniform. Also for some reason if you are not able to finish the whole floor and fall little bit short, can you epoxy the remainder of the floor some other time without much issues?