adamentium
Member
- Joined
- Jul 10, 2010
- Messages
- 8
this is my first post here. i have been a member for a while but i have just been exploring. it has taken me alot longer to get to this point in my shop them i would have liked due to sickenss and such but it is getting there. i though that i would post pictures of the U-coat-it floor that i finished last weekend. it took alot longer to due but i think it is worth it. i have one last thing to do before it is finished. i want to put my company logo in the gray area and i will take pictures.
i have a 2 car attached so this is built to be just a shop not storage JUST A SHOP! (trying to get the wife to understand that) i did start to move things in temporaly because i need to finish a few other things before the snow flys. i will be working on it over the winter.
the first picture is at night on my cell phone. the rest are done during the day after i remembered that i did not have any good pictures of the floor before i started to fill it up.
oops!
i have a 2 car attached so this is built to be just a shop not storage JUST A SHOP! (trying to get the wife to understand that) i did start to move things in temporaly because i need to finish a few other things before the snow flys. i will be working on it over the winter.
the first picture is at night on my cell phone. the rest are done during the day after i remembered that i did not have any good pictures of the floor before i started to fill it up.


.