lreops
Member
Does the application of an epoxy covering require that it be done all at the same time or can you feather a stopping point and continue at that point later?
The reason I ask is because I'm planning to do my shop floor soon. I have a lot of equipment and other things on my shop floor with no place to really move them to. I am hoping that I can move everything to one side, epoxy the other side, let it harden, then move everything to that side and finish the remaining side. Is this possible?
Ron
