Excavation complete - Are leaves a problem?

going88mph

Member
Joined
Sep 19, 2012
Messages
23
Hello,

My 24x30 foundation/slab has recently been excavated for a monolithic pour. Concrete is set to arrive in two days. With fall here, and a wooded lot, a lot of leaves have accumulated in the footing/slab area. Is this a problem? Should I break out the leafblower before the truck arrives?

thanks!
 
To avoid these ads, REGISTER NOW!

Jackfre

Well-known member
Joined
Dec 26, 2010
Messages
4,411
Location
N CA
No deleterious material. It won't hurt the concrete. It will draw bugs. How do you want to begin;)
 

MoonRise

Well-known member
Joined
Nov 5, 2010
Messages
4,030
Location
NJ
Yeah, break out the leafblower before pouring the concrete.

You want the concrete to be on top of the clean gravel, which is on top of the 'clean' ground.

No (or minimal) organic material left in place to rot or decompose or cause eventual voids or hollows or so forth.

Worst case with sloppy/agressive concrete pouring/placement is that all that crud gets slopped into the wet concrete and then stains the concrete ('best' case of this possible 'worst' case) or you end up with glopped wet concrete-coated leaves all over the surface of your concrete slab or glopped into the slab itself (would like like **** and be a mess to smoth the slab surface if that happens).

Blow the leaves out of the way before the pour, keep them out of the wet concrete (no glopped leaves added to the concrete mix, leaves are not a 'proper' concrete additive :D )and off of the wet concrete (stains), and keep them off of the 'drying' (actually "curing") concrete unless you really don't care about stains on the slab.
 
To avoid these ads, REGISTER NOW!

PT Doc

Well-known member
Joined
Nov 12, 2010
Messages
3,197
Cover with plastic after blowing leaves out seems like a logical plan.
 

Spudland_Dave

Well-known member
Joined
Mar 12, 2010
Messages
3,025
Location
Maine
Or cut down all of the trees....

Thats my style... :beer:

The basement floor in our house was poured in the early fall...Luckily I finished most of the basement so you cant see it, but there are quite a few areas where leaves were finished into the concrete surface...nothing which is a structural problem but I've got Oak & Maple Leaf "Fossil Imprints" in my concrete now.
I joked with my concrete guy when we did the garage...told him I'd pay him $500 extra to not float a leaf into my floor...Said he HATES Fall pours for that reason...virtually impossible on windy days.
 

truckone176

Member
Joined
Oct 7, 2012
Messages
23
Yes, get the leaves out of there before you pour. Last year my neighbor had their house leveled and stabilized with the in-ground anchors and the engineer that came out and surveyed the site said that the leaves were part of the problem. The house is a walkout on a slight slope and the leaves decompose and become a "grease" between the concrete and the substrate. His house was literally sliding down the slope thanks to the decomposed leaves.
 
OP
G

going88mph

Member
Joined
Sep 19, 2012
Messages
23
Welp i got out the leafblower/vac and cleaned as well as i could. Slab is poured now. Will make sure it gets covered after they finish smoothing it out. Thanks.
 