Hello,
My 24x30 foundation/slab has recently been excavated for a monolithic pour. Concrete is set to arrive in two days. With fall here, and a wooded lot, a lot of leaves have accumulated in the footing/slab area. Is this a problem? Should I break out the leafblower before the truck arrives?
thanks!
My 24x30 foundation/slab has recently been excavated for a monolithic pour. Concrete is set to arrive in two days. With fall here, and a wooded lot, a lot of leaves have accumulated in the footing/slab area. Is this a problem? Should I break out the leafblower before the truck arrives?
thanks!