I poured my slab on 5-29 and even before we got to finishing it off with a power trowel we started to see spider cracks.
I figured oh well at least I don't have to worry about a crack ruining my day sometime in the future.
Before anyone ask's I will just say that yes I compacted and soaked the ten loads of snow sand that were used for fill. Site was excavated to well below grade and refilled with moocho snow sand. If you haven't heard of this before it is what they use to put on the roads in the winter time and it packs like concrete. Tractor tires would'nt even hardly leave a mark in it after the plate compacter was run over it.
I used black plastic on top of the rock and had #4 rebar every 18 inches each direction. We poured thirty yards on a day that was around 65 degrees and a light wind. I ordered a 5 and a half sack mix from a local supplier and and was on a will call as the weather here had been iffy. First load showed up by 8:30 and we were done pouring by 11 am or so. I kept the slab wet for a week. And as I stated before we had cracking before we started power troweling.
My question is do you think this es excessive cracking? and should I complain to my supplier ? These spider cracks seem to be getting worse. This slab is 44' by 48'. You can't tell from the pics but are a minimum of 9 cracks running across the slab on the far side of the building picture down the length before the first paralell expansion joint cut.
I used a green blade early entry saw the morning after the pour. There are four control joints every 10 or eleven feet each direction that are at least an inch deep. Slab is 5 inches deep. The concrete torched off when it was poured even though we tried to pour a 5 or 6 slump. We ended up having to use some water to get the power trowel to work because it was setting up so fast.
Before anyone ask's I will just say that yes I compacted and soaked the ten loads of snow sand that were used for fill. Site was excavated to well below grade and refilled with moocho snow sand. If you haven't heard of this before it is what they use to put on the roads in the winter time and it packs like concrete. Tractor tires would'nt even hardly leave a mark in it after the plate compacter was run over it.
I used black plastic on top of the rock and had #4 rebar every 18 inches each direction. We poured thirty yards on a day that was around 65 degrees and a light wind. I ordered a 5 and a half sack mix from a local supplier and and was on a will call as the weather here had been iffy. First load showed up by 8:30 and we were done pouring by 11 am or so. I kept the slab wet for a week. And as I stated before we had cracking before we started power troweling.
My question is do you think this es excessive cracking? and should I complain to my supplier ? These spider cracks seem to be getting worse. This slab is 44' by 48'. You can't tell from the pics but are a minimum of 9 cracks running across the slab on the far side of the building picture down the length before the first paralell expansion joint cut.
I used a green blade early entry saw the morning after the pour. There are four control joints every 10 or eleven feet each direction that are at least an inch deep. Slab is 5 inches deep. The concrete torched off when it was poured even though we tried to pour a 5 or 6 slump. We ended up having to use some water to get the power trowel to work because it was setting up so fast.