ron in sc
Well-known member
We were sure the pad for the concrete would pass the nuclear density test, which determines if the moisture levels, compaction and some other stuff are ok to pour. We were so sure the contractor even had most of wire, slab blosters and moisture barrier installed, see photo. That was on Tuesday. Apparently it had not dried out enough from all the rain we had on Saturday and Sunday.
Well we flunked the test so we has to wait until Friday to test again. That time we passed so we are supposed to pour on Monday at about 9:00 am.
Well we flunked the test so we has to wait until Friday to test again. That time we passed so we are supposed to pour on Monday at about 9:00 am.