About 2 weeks ago I had the concrete floor of my new building treated.
The floor was a mess due to the construction activity that has taken place since it was poured in December.
The crew extensively cleaned the floor; did some grinding; put down a densifier; put down a sealer.

I'm pleased with the result. Yesterday I was out in the building and realized the control joints that were sawn into the concrete would get filled with "stuff" when I start using the place.
Any thoughts on what, if anything, I should do to prevent dirt and such from getting into the control joints. I did a search but most of the things I found didn't really fit my situation.
I asked this question in my build thread and got a couple of answers. I decided I probably should post something here to get a more comprehensive set of responses.
Scott
The floor was a mess due to the construction activity that has taken place since it was poured in December.
The crew extensively cleaned the floor; did some grinding; put down a densifier; put down a sealer.

I'm pleased with the result. Yesterday I was out in the building and realized the control joints that were sawn into the concrete would get filled with "stuff" when I start using the place.
Any thoughts on what, if anything, I should do to prevent dirt and such from getting into the control joints. I did a search but most of the things I found didn't really fit my situation.
I asked this question in my build thread and got a couple of answers. I decided I probably should post something here to get a more comprehensive set of responses.