red caddy
Well-known member
I shared this in another forum,but got no responce, so I'll "ask the pro's"
Have any of you ever heard of or seen boiled linseed oil used as a sealer/finish on a concrete slab floor? I was told that 2 coats rolled on wet,48 hours apart, after a 30 day cure time for the slab, gives a non dusting,non slip, petroleum resistant finish, that is long wearing, and easily renewed. Opinions? thanks RED
Have any of you ever heard of or seen boiled linseed oil used as a sealer/finish on a concrete slab floor? I was told that 2 coats rolled on wet,48 hours apart, after a 30 day cure time for the slab, gives a non dusting,non slip, petroleum resistant finish, that is long wearing, and easily renewed. Opinions? thanks RED