Milton Shaw
Well-known member
- Joined
- Feb 11, 2011
- Messages
- 4,836
Looks like you have enough room to double up the rim joist and another 2x4 treated sill plate and nail everything together. That might be easier than doubling up or sandwiching every joist. Even just using 3' pieces of lumber for the extra rim joist would be easier to install than long pieces. Just nail them to the existing rim joist.
