Ok, guys, getting closer by the day to building the new building
It is going to be a "40x96x16". Of that 40x66 is going to finished off with 6" concrete floors with radiant heat, 1" spay foam on walls and R21 fiberglass with tin.
Here are questions.
I see 2" foam board on the floor is the best for insulation.
Now, with the footers and 4' poured walls, should I be insulating the poured walls up to the concrete floor?
What about the pex. Should that be right on top of the foam board or should it be raised up into the concrete? I will have a 15k lift in the building, I dont want to have to worry about drilling the anchors into the pex, should I box out the pex where the lift is going?
What about the vapor barrier? Under for over the foam board?
It is going to be a "40x96x16". Of that 40x66 is going to finished off with 6" concrete floors with radiant heat, 1" spay foam on walls and R21 fiberglass with tin.
Here are questions.
I see 2" foam board on the floor is the best for insulation.
Now, with the footers and 4' poured walls, should I be insulating the poured walls up to the concrete floor?
What about the pex. Should that be right on top of the foam board or should it be raised up into the concrete? I will have a 15k lift in the building, I dont want to have to worry about drilling the anchors into the pex, should I box out the pex where the lift is going?
What about the vapor barrier? Under for over the foam board?