Ethernaut85
Member
Planning on framing in and insulating this building over the winter and I had a couple questions regarding framing in this wall here with the header?

My thought was nailing a 2x10 ripped down to cover that gap then framing with 2x4s in traditional 16” centers. I’d have to shim out the 6x6’s and 2x6’s to be flush with that header you see at the top. Then my plan was to insulate with unfaced r19, since the building is wrapped with that reflectix bubble wrap. From what I’ve read that is my vapor barrier.
Then above what would be my top plate that my studs will nail into, I was going to just let the blow in insulation I’m putting in the attic be the insulation for that 10-12” or so
Does anyone see any issue with this?
Sent from my iPhone using Garage Journal

My thought was nailing a 2x10 ripped down to cover that gap then framing with 2x4s in traditional 16” centers. I’d have to shim out the 6x6’s and 2x6’s to be flush with that header you see at the top. Then my plan was to insulate with unfaced r19, since the building is wrapped with that reflectix bubble wrap. From what I’ve read that is my vapor barrier.
Then above what would be my top plate that my studs will nail into, I was going to just let the blow in insulation I’m putting in the attic be the insulation for that 10-12” or so
Does anyone see any issue with this?
Sent from my iPhone using Garage Journal