The flooring contractor started grinding on my 30x40 garage floor, 5 inches thick and 5000psi. Two guys started grinding last Monday, thought they would be done mid-day Tuesday. They were still at it 7pm Tuesday evening and were coming back Wednesday to finish up. The lead man said they had never run into a slab this hard to grind, said whoever poured it had done a great job. Due to the weather and road conditions in Michigan they asked if they could put off the coating install until Monday, glad they did the roads were real bad in West Michigan today. Three installers will be back Monday to install the full chip.
The photo is from Tuesday night. I'll post a photo of the final grinding tomorrow after I plow my way to the house. I'll post the finished job next week.
https://www.garagejournal.com/forum/showthread.php?t=378447
The flooring contractor started grinding on my 30x40 garage floor, 5 inches thick and 5000psi. Two guys started grinding last Monday, thought they would be done mid-day Tuesday. They were still at it 7pm Tuesday evening and were coming back Wednesday to finish up. The lead man said they had never run into a slab this hard to grind, said whoever poured it had done a great job. Due to the weather and road conditions in Michigan they asked if they could put off the coating install until Monday, glad they did the roads were real bad in West Michigan today. Three installers will be back Monday to install the full chip.
The photo is from Tuesday night. I'll post a photo of the final grinding tomorrow after I plow my way to the house. I'll post the finished job next week.