I will preface this question with I typically over think things and sometimes a bit OCD. I am currently installing steel liner panels on my ceiling. I am to the garage door track. This looks easy enough, just drop the track a little slide the panel in and re-install. The problem I am seeing at this point is my unfinished walls. The garage doors are installed right up against the studs and header, in order to finish these walls it appears I will have to move the three garage doors out 1/2" for wall board ( I HATE THE THOUGHT OF MOVING THESE DOORS), and if I move the doors out 1/2" the track will also move and the hole I put in the steel ceiling panel will no longer work. I feel like I am opening a can of worms trying to put wall board between the studs and garage doors. Any thoughts of how you have or would handle this situation. Thanks for reading about my issue.
Foamer
Foamer