Snapped-off
Well-known member
I keep running into roadblocks. Before I cover the walls of the shop, I need to insulate, before that I want to move the electrical, before that, I need to figure out a solution to the current 2x4 framing, which will affect the electrical.
The current dilemma, should I add some 2x2 strips to the current framing? I'd like the future walls to be flush with the blocks.
I've got 2 ¼" of space from the sill plate to the edge of the block. So while it won't be quite flush it'll be as close as it will get I think.
Should I put a vertical 2x2 on each stud with one along the sill plate? Or just run 3-4 horizontal strips across the studs?

The current dilemma, should I add some 2x2 strips to the current framing? I'd like the future walls to be flush with the blocks.
I've got 2 ¼" of space from the sill plate to the edge of the block. So while it won't be quite flush it'll be as close as it will get I think.
Should I put a vertical 2x2 on each stud with one along the sill plate? Or just run 3-4 horizontal strips across the studs?