It's been a long haul getting the new garage/shop done...
We started in April getting estimates, ran into some hurdles with septic, moving a 10x20 garden shed, and location, etc.. but things got rolling. It's 24x38 and will have a seperate storage room and small office to be added later.
June: select bidder
July: Finally get septic location identified and plan approved
August: Get septic moved and final permits approved
Sept:
Oct:
As you can see the front half has a 10' ceiling. I removed the ceiling joists in the rear and added collar ties in order to have a "cathedral style" ceiling to make room for the lift. This area will be insulated and finished by a laborer as I don't have the scaffolds.
..and plenty of room for the race rig to park alongside!
We started in April getting estimates, ran into some hurdles with septic, moving a 10x20 garden shed, and location, etc.. but things got rolling. It's 24x38 and will have a seperate storage room and small office to be added later.
June: select bidder
July: Finally get septic location identified and plan approved
August: Get septic moved and final permits approved
Sept:
Oct:
As you can see the front half has a 10' ceiling. I removed the ceiling joists in the rear and added collar ties in order to have a "cathedral style" ceiling to make room for the lift. This area will be insulated and finished by a laborer as I don't have the scaffolds.
..and plenty of room for the race rig to park alongside!