OP
Jagmandave
Well-known member
nolimits, I had the bench top custom made at a local sheet metal shop, they made it out of 18 ga stainless, welded the left corner where the backsplash comes together, and welded the right side where I had them fold down a 1-1/2" piece to match the front. They bent a 1-1/2" front with a 1" return underneath - total cost was $209.
They did a fantastic job and it fit perfectly - for the underlayment I used a 4X8 piece of particle board sliced down the middle to make two 2x8s, laid on top each other gave me the 1-1/2" thick and plenty of stiffness.
I won't have the cabinets till mid next week, and I'll still haven't made a final decision as to placement - still kicking around some ideas. I saw the cabinets at $135 originally too......
I did get my electrical done, and all the lights are now working off of the wall switch - let there be light!
View media item 34386
I also found a good deal on CL for a Harbor Freight 20 ton press, I'm picking it up tonight only about a mile from my house!
Projects still to do: remove all the schmutz on the other two benches and paint behind them, move as much of the loose detritus to the basement temporarily, then once the cabinets are up, start getting stuff relocated. Also, I still have to figure out my nut/bolt/odds'n ends storage.....
They did a fantastic job and it fit perfectly - for the underlayment I used a 4X8 piece of particle board sliced down the middle to make two 2x8s, laid on top each other gave me the 1-1/2" thick and plenty of stiffness.
I won't have the cabinets till mid next week, and I'll still haven't made a final decision as to placement - still kicking around some ideas. I saw the cabinets at $135 originally too......
I did get my electrical done, and all the lights are now working off of the wall switch - let there be light!
View media item 34386
I also found a good deal on CL for a Harbor Freight 20 ton press, I'm picking it up tonight only about a mile from my house!
Projects still to do: remove all the schmutz on the other two benches and paint behind them, move as much of the loose detritus to the basement temporarily, then once the cabinets are up, start getting stuff relocated. Also, I still have to figure out my nut/bolt/odds'n ends storage.....
Last edited:


