Burgerkong
Well-known member
Here's my rendition. Half completed ATM, still have to hang the other shelf on the other side of the garage, plus lag them to some slotted angle attached to the ceiling. Apparently my builder skimped on materials and decided to use less studs and instead screw in a whole sheet of OSB then drywall overtop. Had to anchor some 2x4's in so the self would sit on them.
Oh, and the Paulin Saw Tooth construction screws I used to attach the planking on top is the shizznit, grabs almost instantly!
(Yes, my Athol is still in pieces waiting for its electrolysis dip)
Took a while due to the limited room, will finish it tomorrow.
Oh, and the Paulin Saw Tooth construction screws I used to attach the planking on top is the shizznit, grabs almost instantly!
(Yes, my Athol is still in pieces waiting for its electrolysis dip)
Took a while due to the limited room, will finish it tomorrow.


