unsinkable
Well-known member
Well, moving right along.
I had a great crew, completely framed in 4 1/2 days !!!
it's 30x40 with 14' ceilings on first floor and 8' ceilings on second.
Garage doors are 12' tall (10 and 12' wide)
One 1/4 of 2nd floor is open to below, making the ceiling height there 23 feet tall, so lifting tall vehicles is possible. Clear span, no columns.
Still a long way to go, hvac, plumbing, insulation, electric, and board.
PSYCHED !
this site is great...
http://i115.photobucket.com/albums/n297/kVARS/garage/11701CAB-C760-4830-8352-EA5017AAE610.jpg
http://i115.photobucket.com/albums/n297/kVARS/garage/E8874913-9F40-4032-9444-D66903D0450E.jpg
http://i115.photobucket.com/albums/n297/kVARS/garage/F51F375E-E1D5-43A2-B0A7-AD7B8FADE54D.jpg
http://i115.photobucket.com/albums/n297/kVARS/garage/F6136240-FADB-49C7-9277-6154BF6F0529.jpg
I had a great crew, completely framed in 4 1/2 days !!!
it's 30x40 with 14' ceilings on first floor and 8' ceilings on second.
Garage doors are 12' tall (10 and 12' wide)
One 1/4 of 2nd floor is open to below, making the ceiling height there 23 feet tall, so lifting tall vehicles is possible. Clear span, no columns.
Still a long way to go, hvac, plumbing, insulation, electric, and board.
PSYCHED !
this site is great...
http://i115.photobucket.com/albums/n297/kVARS/garage/11701CAB-C760-4830-8352-EA5017AAE610.jpg
http://i115.photobucket.com/albums/n297/kVARS/garage/E8874913-9F40-4032-9444-D66903D0450E.jpg
http://i115.photobucket.com/albums/n297/kVARS/garage/F51F375E-E1D5-43A2-B0A7-AD7B8FADE54D.jpg
http://i115.photobucket.com/albums/n297/kVARS/garage/F6136240-FADB-49C7-9277-6154BF6F0529.jpg
jk