Hey everyone, I’m currently having a 30x40 pole shed built and I am going to install a 100 amp sub panel in the building myself. I am planning on running 1/0-1/0-1/0-2 aluminum wire through a 2” conduit that will go through the concrete floor (floor not poured yet).
I’m going to install 2 ground rods outside the building and run #6 copper to those rods from the sub panel. One thing I’m not sure about though is how to get that copper wire from the box to the rods. Ideally I would run that wire in the same 2” pvc conduit as the feeder cable. I wound then pound the ground rods in the same trench as the feeder cable too. Are there any issues with doing that? My goal here is to run things through the floor to the outside so I don’t have any conduit showing above ground.
I’m going to install 2 ground rods outside the building and run #6 copper to those rods from the sub panel. One thing I’m not sure about though is how to get that copper wire from the box to the rods. Ideally I would run that wire in the same 2” pvc conduit as the feeder cable. I wound then pound the ground rods in the same trench as the feeder cable too. Are there any issues with doing that? My goal here is to run things through the floor to the outside so I don’t have any conduit showing above ground.